SACRAMENTO WATER TREATMENT PLANT
During the $113.7 million rehabilitation of the City of Sacramento Water Treatment Plant located on Water Street in Sacramento, Rados is to install various 66” and 84” diameter pipes, risers, and manifolds. Rados’ work will be staged throughout the duration
4 Likes
BDPL5 Cordilleras Micro-Tunnel
The installation of 60” welded steel pipe; 465 LF by tunneling and 920 LF by open cut method. The project also included the installation of special fittings, corrosion protection, air vacuum assemblies, roadway restoration of Bennett Road in Redwood City,