Rados Selected Contractor for Palos Verdes Walter Reliability Project
In June 2018, California Water Service will begin replacing aging infrastructure by installing 7 miles of new drinking water pipeline to improve the reliability and safety of the drinking water system that serves all 90,000 of the Peninsula’s residents. Currently, the
5 Likes
Steve P. Rados, Inc. awarded Tequesquite Arroyo Trunk Sewer
On May 15, 2018, The City of Riverside awarded the Tequesquite Arroyo Trunk Sewer Replacement Phase IIB to Steve P. Rados, Inc. The City of Riverside has a Sewer Program which includes projects to increase system capacity for new users
5 Likes