The traditional method by which many public and private infrastructure projects have been delivered is for the Contractor to prepare a cost estimate (Bid) based on a complete set of plans and specifications prepared under the direction of an Owner and, if the Contractor is deemed the lowest responsible bidder, will build that project in accordance with those plans and specifications.
In our 90+ year history, the Bid/Build method of project delivery has been our core delivery method. Steve P. Rados, Inc has an extensive proven record of successfully performing projects under the Bid/Build method of project delivery.
Bid Build Projects

Bid Build Bridges Transportation
Horse Thief Creek Bridge
Steve P. Rados, Inc. replaced the Horse Thief Creek Bridge on Highway 138 in Hesperia. The construction work started in October 2014 and was completed in October 2016.

Bid Build Heavy Construction Pipelines
Brushy Creek Pipeline No. 3
Steve P. Rados, Inc. once again partnered with The Department of Water Resources to construct the Discharge Line and Brushy Creek Pipeline No. 3.

Bid Build Transit Transportation
Metro Greenline
The project consisted of over 13,000 LF of a post-tensioned box girder bridge guideway, five transit stations, and a 2,000 LF of an at grade section constructed with mechanically stabilized earthen retaining walls.

Bid Build Highways Transportation
Washington/SF Grade Separation
Steve P. Rados, Inc. had several contracts associated with the Alameda Corridor Trench Rail and Street Improvement, a mega project which grade depressed rail freight lines between the Ports of Los Angeles and Long Beach.

Bid Build Highways Transportation
Reconstruction 405 – Sepulveda
This contract widened and reconfigured the northbound 405 Freeway in Sherman Oaks, CA.

Bid Build Highways Transportation
I-215 Highway – Segments 1 & 2
SRJV reconstructed approximately 2-1/2 miles of the I-215 Freeway through the City of San Bernardino, CA.

Bid Build Bridges Transportation
First Street Bridge Widening
Rados widening of the First Street Bridge over the LA River in the City of Los Angeles by approximately 26 feet to the north.

Bid Build Bridges Transportation
Tustin Ranch Road
Rados constructed a four-span post-tensioned concrete box girder Bridge that will carry Tustin Ranch Road over Edinger Avenue.

Bid Build Bridges Joint Ventures Transportation
North Main Street Bridge
In a modified two phase construction sequencing, Rados/Polich will seismically retrofit the arch girders that support the deck and superstructure of this bridge.

Bid Build Concrete Channels and Reservoirs Heavy Construction
Tehachapi East Afterbay – Phase 2
This contract was under the auspices of the California Department of Water Resources and involved the completion of portions of a box culvert and trapezoidal channel in Los Angeles.

Bid Build Concrete Channels and Reservoirs Heavy Construction
Flume 4950 Replacement
Removal and replacement of approximately 1,500 LF of flume and a new spillway in a remote section of El Dorado County, CA.

Bid Build Heavy Construction Plants
Water Pump Station
In Phase 1 of the project Rados removed an existing 500HP electric driven vertical turbine pump and replaced it with a 700 HP electric driven vertical turbine pump system.

Bid Build Heavy Construction Plants
NCOS – Air Treatment Facility
Under a directive from AQMD, the City of Los Angeles was mandated to construct three air treatment facilities throughout the City, to purify and deodorize the sewer gases from major trunk lines throughout the City.

Bid Build Heavy Construction Plants
Long Beach Main Sewage Pump Lift Station
Major items of work included in this sanitary sewer pump station upgrade project will be site demolition of existing buildings and utilities, relocation of power cables, shoring, jet grouting, excavations, major concrete structures, etc.

Bid Build Heavy Construction Pipelines
Sacramento Water Treatment Plant
$113.7 million rehabilitation of the City of Sacramento Water Treatment Plant located on Water Street in Sacramento.

Bid Build Heavy Construction Pipelines
River Supply Conduit – Unit 4
$113.7 million rehabilitation of the City of Sacramento Water Treatment Plant located on Water Street in Sacramento.

Bid Build Heavy Construction Pipelines
BDPL5 Cordilleras Micro-Tunnel
The installation of 60” welded steel pipe; 465 LF by tunneling and 920 LF by open cut method.

Bid Build Heavy Construction Pipelines
Alameda Siphon No. 4
Rados installed a fourth siphon along the Hetch Hetchy regional water system to provide redundancy in the event of a major seismic event.

Bid Build Bridges Transportation
Gibby Road Bridge and SMWD Improvements
Project Title: JOB 752 – GIBBY RD BRIDGE AND SMWD IMPROVEMENTS Contract No.: 036C-1152 Contract Amount: $21,934,443 Job Duration: JUNE 2022 through OCTOBER 2023 Agency: RMV PA3 Development, LLC – Rancho Mission Viejo Work Performed: Construct 220ft cast-in-place prestressed […]