Myers-Rados Joint Venture Awarded 15/91 Express Lane Connector Design-Build Project
On March 11, 2020, Myers-Rados Joint Venture was awarded a $165,000,000 contract to design-build the 15/91 Express Lane Connector project for Riverside County Transportation Commission (RCTC). MRJV will team with TY Lin as its designer. The project will link the future 15 Express Lanes currently under construction to the 91 Express Lanes. A new connection will be provided from the eastbound 91 Express Lanes to the future northbound 15 Express Lanes and from the future southbound 15 Express Lanes to the westbound 91 Express Lanes. The construction will occur within city of Corona limits and is scheduled to reach substantial completion in June 2023 and contract completion in December 2023.