Project Title: JOB 752 – GIBBY RD BRIDGE AND SMWD IMPROVEMENTS
Contract No.: 036C-1152
Contract Amount: $21,934,443
Job Duration: JUNE 2022 through OCTOBER 2023
Agency: RMV PA3 Development, LLC – Rancho Mission Viejo
Work Performed: Construct 220ft cast-in-place prestressed concrete box girder bridge over San Juan Creek. Construct jet grout columns and grouted rip rap to prevent erosion from future creek flows at the abutment embankments. Construct 4,500lf of 30″ cement mortar lined pipe for a reclaimed water line from existing Trampas reservoir to a future connection point for the development. Demo the existing Arizona Crossing, install hydroseed and small bio-filtration basin for water quality enhancement.