Project Title: Hinkle Reservoir Liner and Cover Replacement
Contract Amount: $20,139,000
Job Duration: May 2022 thru December 2023
Agency: San Juan Water District
Work Performed: Hinkle Reservoir is a 65-million-gallon potable water reservoir servicing over 265,000 customers in the Sacramento Region. Steve P. Rados, Inc provided full demolition of the existing 12 acre CSPE cover, renovations of the inlet and outlet structures, installation of stainless-steel slide gates, and subcontractor support to Viaflex for the liner and cover installation. The work inside of the drained reservoir occurred during the winter months and Steve P. Rados, Inc was able to get the reservoir back online eight days early.