Project Title: I-215 Highway Construction, Segments 1 & 2
Contract No.: C09-196
Contract Amount: $168,875,500 (a Skanska-Rados Joint Venture – SRJV)
Job Duration: December 2009 through November 2013
Agency: San Bernardino Associated Governments (SANBAG)
Work Performed: SRJV reconstructed approximately 2-1/2 miles of the I-215 Freeway through the City of San Bernardino, CA. The entire freeway alignment was widened and reconstructed in four major traffic control phases. The joint venture reconstructed, in three separate stages, bridges at 2nd, 3rd, 9th, and 16th streets; new on and off ramps at 5th Street and Baseline Road; and reconfiguring other ramps and local streets along the alignment.
Also constructed were a number of major retaining walls and sound walls, as well as major drainage improvements to the freeway drainage system.