Contract No.: 7294
Contract Amount: $21,599,345
Job Duration: September 2015 through July 2017
Agency: City of Riverside Public Works Department
Work Performed: This project entails the installation of approximately 10,500 ft. of new 48” Centrifugally Cast Fiberglass Reinforced Plastic Mortar (CCFRPM) Pipe using several construction methods. The 48” diameter CCFRPM pipe will replace two existing sewer pipes running along the Santa Ana River from where Phase I ended at the easterly end of Martha McLean-Anza Narrows Park located at 5759 Jurupa Ave. to the westerly end of Ryan Bonaminio Park located at 5000 Tequesquite Ave. The existing pipes consist of 24” Vitrified Clay Pipe (VCP) that was installed in the early 1940s and 33” Vitrified Clay Pipe that was installed in the early 1950s.